Stuck for 6 years, now on track: Metro Line 4’s final piece falls into place
India

Stuck for 6 years, now on track: Metro Line 4’s final piece falls into place

Indian Express·3h ago·Hope

What Happened

The Mumbai Metropolitan Region Development Authority acquired land for Laxmi Nagar station in Vikhroli, the last remaining station on Metro Line 4. The 16,762 sqm plot was purchased from Godrej & Boyce Manufacturing Company for Rs 164.31 crore. Land acquisition talks began in 2019 but faced legal challenges and bureaucratic delays. Construction surveys are underway. The 32.32-km corridor targets full operations by 2027, expected to reduce travel time between Thane and Mumbai by 50-75 percent.

Key Entities

Mumbai Metro Line 4MMRDALaxmi Nagar stationGodrej & Boyce Manufacturing CompanyVikhroliWadala-Kasarvadavali corridor2027 completion target

AI Tools